Scaffolding for new-build projects in Haverhill and the surrounding counties. Access discussed around your drawings, build stages and site programme.

Access as the build progresses

Plan the scaffold alongside the build.

A new build changes as the structure rises and different trades arrive. Scaffold access needs to be considered alongside brickwork, roofing and external finishing. Resolve works with builders and developers across Suffolk, Cambridgeshire and Essex to discuss the access required at each stage.

From the people we work with.

Recently had Resolve Scaffolding they were very efficient and friendly,great customer service and left everywhere clean and tidy I would definitely recommend

Working with Resolve

Bring the drawings and the programme together.

The sequence of work helps establish when and where access is needed.

Share plans, elevations and your proposed build programme. Explain the site layout, deliveries, material-handling arrangements and the trades who will need working access as the structure progresses.

Discuss the initial scaffold scope, planned changes and hire duration before installation. Keep the team informed as the programme develops, so alterations and dismantling can be coordinated with the work on site.

Talk through your requirements

Before you enquire

New Build Scaffolding FAQs.

Practical details to help you plan your enquiry.

Enquire during planning of the construction programme, with drawings and proposed dates available where possible. This allows the access requirements and sequence of work to be discussed before installation is needed.

Discuss the expected build stages and access requirements at the quotation stage. Planned alterations and any later changes need to be agreed with the team rather than carried out by other trades.

Site plans, elevations and relevant building dimensions are useful. Include the programme and information about site access, deliveries and the tasks the scaffold will support.

Share the requirements and timings of the trades using the scaffold. The access scope should consider brickwork, roofing and external finishing so the arrangement can be discussed against the build sequence.

Tell us as soon as you expect a delay. We can discuss its effect on the hire period, planned alterations and dismantling, including any changes to the agreed costs or dates.